Executive Challenge
Siloed electronic health record (EHR) feeds across 140 acquired clinics created dangerous six-hour delays in critical diagnostic syncs and blocked compliance sign-off for a unified clinician workspace.
Zero-Trust Interoperability Architecture
PrimeShift architected an isolated VPC ingestion plane utilizing field-level envelope encryption (AWS KMS CMKs), schema-validated HL7v2-to-FHIR R4 canonical transforms, and cryptographically signed PHI access audit logs.
- Zero Plaintext PHI in Transit or Logs: Automated PII/PHI scrubbing filters verified in CI/CD pipelines before container promotion.
- Resilient Backpressure Queuing: Burst clinical telemetry spikes absorb up to 10x normal volume without dropping diagnostic payloads.